Home > About us > PROPOSAL FOR 1000T/D CLINKER PRODUCTION LINE
PROPOSAL FOR 1000T/D CLINKER PRODUCTION LINE
 

 

CONTENT

目錄

 

 

1                 Design basis and conditions     設計依據和條件                                   2

2                 Scope of proposal           項目范圍                                                     4

3                 Performance guarantees     履約保函                                                6

4                 Description of the plant   工廠描述                                                7

4.1    Process description  工藝描述                                                     7

4.2    Electricity and automation電氣和自動化                                         11

5                 Main equipment List  主機設備清單                                                     16

6                 Project Schedule項目過度表                                                               19

7                 Site service and technology training    服務與技術培訓                        20

     Annex1  Equipment list of the cement line

附件1:水泥生產線設備清單

     Annex2  Process flow sheet

      附件2:工藝流程

     Annex3  General layout

      附件3:總體布局

 


1.   Design basis and conditions

 

1.1       Locations of the plant:       

 

1.2       Technology way:             dry rotate kiln technology

 

1.3       Production capacity           1000t/d clinker 

 

1.4       Cement variety                          Ordinary Portland Cement according to

Chinese standard

 

1.5       Site condition

Plant site condition(工廠條件)

1.5.1 Altitude of the site above sea-level(廠址海拔標高)60m

1.5.2 Temperature(溫度):

Annual average(年平均):

Average of the hottest month: Max. (最熱月份平均氣溫:最高):  48

Average of the coldest month: Min. (最冷月份平均氣溫:最低):   8

 

1.5.3 Rainfall (降雨量)

Max. (within a hour/day) (最大降雨量:一小時/):   2 mm

Annual average(年平均):   6 mm

Number of rainy days(降雨天數) 80 days

 

1.5.4 Earthquake factor at site(廠區地震等級):  No

1.5.5 Max. wind velocities at site(廠區最大風速): 140m/s

     

 

1.6       Characteristics of Raw Materials

 

Limestone

CaO

MgO

K2O+Na2O

SO3

f SiO2

Limestone 1

>48

<3

<0.6

<1

<4

Limestone 2

>45

<3.5

<0.8

<1

<4

 

1.7       Seismic intensity                  < Richter scale 7Characteristics 

 

1.8       A plan and flat land is assumed with the soil bearing capacity of  200 kpa/m2

 

1.9       Wind pressure                       Pa

 

1.10    Temperature: yearly average        

 

1.11    Clinker module

 

The contractor can specify the raw material proportioning for raw meal, The average components of clinker must be in conformity with the requirements of clinker module.:

承包商可以指定生料配料,熟料的平均成分必須符合熟料模塊的要求:

Lime saturation value of clinkerKH=0.89±0.01

熟料的石灰飽和值:KH = 0.89±0.01

Silica modulus              SM=2.6±0.1

二氧化硅模量:SM = 2.6±0.1

Alumina iron modulus        IM=1.6±0.1

鋁鐵模數:IM = 1.6±0.1

 

 

 

 


 Print [ close ] Top
Copyright © Jiangsu Pengfei Group Co.,Ltd. All Rights Reserved.
精品无码久久久久久久久| 成人精品视频一区二区三区| 久久国内精品自在自线软件| 真实国产精品视频国产网| 久99久热只有精品国产男同| 九九热线有精品视频99| 国产精品一久久香蕉产线看| 精品一区二区三区免费| 日本精品夜色视频一区二区| 999久久久无码国产精品| 国产AV午夜精品一区二区三区 | 国产精品午夜无码av体验区| 精品一区二区三区自拍图片区| 91热成人精品国产免费| 精品无码一区二区三区在线| 人人妻久久人人澡人人爽人人精品| 国产乱人伦精品一区二区在线观看 | 国产精品国产三级国产专播下| 91大神精品网站在线观看| 国色精品va在线观看免费视频| 精品在线观看免费| 久久夜色撩人精品国产av| 在线观看91精品国产入口| 国产精品无码无在线观看| 国产精品高清在线观看| 蜜臀亚洲AV无码精品国产午夜. | 国产69精品久久久久999三级| 国产乱子精品免费视观看片| 99久久精品国产一区二区成人| 精品aⅴ一区二区三区| 国产精品 一区 在线| 国产99视频免费精品是看6| 成人h动漫精品一区二区无码| 国产精品jizz在线观看直播| 久久99国产综合精品女同| 久久精品人人爽人人爽| 7777精品久久久大香线蕉| 99精品久久精品一区二区| 中文国产成人精品久久一区| 国产精品一香蕉国产线看观看| 四虎影视精品永久免费网站|