active lime production line equipment
Description:We, Jiangsu Pengfei Group Co., Ltd supply complete equipments for active lime production line with capacity below 1200 ton per day. The active lime is widely used in steel production, Al2O3 production, Metal Mg production, calcium carbide and Power plant desulfurization paper production area. Active lime is an important auxiliary material in steel making industry. The using of active lime enhances the quality and capacity and lower down the loss and cost. It also stabilizes the operation. As proved in production, the using of active lime in steel making industry is very profitable. Recently years, the capacity of steel industry used lime increased by 40%. High quality lime with activity above 300ml increased from 27% to 29.5%.
Explain:
1.Steelmaking practice certified that, the active lime can improve the desulfurization and dephosphorization efficiency of 80%, and shorten the smelting time. It can be completely take reaction with acidic substances in the molten steel in 3-5 minutes.The lime reaction time of shaft kiln need 6-10 minutes at least.And it also improve furnace ridge above 40%. The furnace burden consumption is reduced to 5-8Kg/t steel,calculated in 10000000tons,savings annual about 15000000,production efficiency is significant.
2.Desulfurization and dephosphorization efficiency of active lime is obviously improved,the average S removal rate of steel is 34.5% ,especially for high S iron (S ≥ 0.06%), efficiency is more obvious, and the S removal agent consumption can be reduced by about 45%.
3.Steelmaking with active lime,iron material consumption can be reduced by 5-15Kg/t steel,than non-active lime.And it also can reduce the steel splash and adhesion on oxygen lance;sticky mouth;flue sticking phenomenon.
4.Lime consumption decreased: steelmaking with active lime, the consumption can reduce 20~25Kg/t steel,compared with non-active lime.And if use non-active lime,consumption is more than 65~70Kg,if use active lime, is 40~41.5Kg/t steel.
5.Steelmaking with active lime,slagging is fast,desulfurization, dephosphorization ability is significant, the production efficiency can be improved by 5%~10%.
6.Quality requirement of the active lime limestone:CaO≥52% SiO2≮2.0% MgO≮1.5%

Process and equipment:
1.Raw material conveying system
Limestone, dolomite after crushing in the mine would be shipped to the factory.and by truck to the material pit,after screening,then conveying to raw material storage. Qualified lime stone particle size 10 ~ 50mm will be conveying to top silo of preheater by lifting equipment. Feed particle size is 10 ~ 50mm, discharging finished size of 5 ~ 40mm above 90%.

2.Active lime calcining system
Active lime calcining system consists of a vertical preheater, rotary kiln, cooler.
Vertical preheater:Vertical preheater is composed of a preheater body, a storage bin, a feeding pipe, hydraulic push rod device etc.. Preheater has polygonal and round using compartment partition device .Making the limestone gradually heating to avoid sharp warming burst into the kiln produces a large amount of powder, limestone decomposition rate is 30% ~ 40%, the average temperature of exhaust gas temperature is 230 ℃ ~ 260, thereby reducing the heat consumption.
Rotary kiln:rotary kiln is composed of cylinder, supporting device, transmission device,block wheel device, kiln tail and kiln head seal,and kiln head cover.The kiln body is 3.5% inclined of level,equipped with two sets supporting device, the roller bearing is the water-cooled oil lubricated bearings, and can automatically aligning with Spherical tile. Near the gear ring is also equipped with hydraulic blocking wheel,using frequency conversion motor driving kiln body, and an auxiliary driving kiln. Kiln head and kiln tail adopts spring type sealing device,using frequency conversion motor driving kiln and with preheater decomposition rate, to control effectively calcination temperature and time, reached the burning and burnt requirements.
Coal burner using coal and gas firing four channel burner. Flexible and convenient adjustment, flexible operation, each air jet velocity can be adjusted during operation, can bring up any flame in different kiln conditions, easy control of calcination temperature.
Vertical Cooler: vertical cooler is composed of cooler body, fixed screen, cooling device, electric vibrating discharging machine etc.. Vertical cooler has many cooling discharge area, each area discharging speed can be controlled separately according to material temperature; cooling air meet hot lime directly,cooling effect is well,ash temperature is low, ash temperature higher than the ambient temperature 40 ℃; cooling air after cooling lime, temperature can be preheated to more than 600℃, one part is used as second combustion air in rotary kiln, the other part is used to dry pulverized coal. Cooler is without moving parts, simple structure, good cooling effect, less equipment repair.

3.Pulverized coal preparation system
Pulverized coal preparation system is an important part of active lime rotary kiln system. There are generally two kinds of system, one is the wind swept coal mill tube mill pulverized coal preparation system with bag dust collector.The system has the advantages of convenient operation, clean environment etc.. Its production process is as follows: Block degree ≤ 25mm coal, from bucket elevator into the belt, then conveyed to coal bunker by belt, through disc feeder or electromagnetic vibration feeder that under coal bunker,the mill is a set of grinding, drying,when grinding, introducing hot air from rotary kiln system or flue gas from auxiliary combustion chamber to dry.Gas with coalcome out from coal grinding machine,in force of the exhaust pumping, enters the separator separation, coarse pulverized coal returned to the mill grinding again through automatic ash discharging valve,and the fine powder was driven into the bag dust collector in force of gas flow,to achieve powder and gas separated. Gas out from separator,the dust discharged after purification by an exhaust fan, a part of exhaust gas recycled in coal grinding mill,another part exhaust gas into the atmosphere through the chimney. Pulverized coal collected by the dust collector is discharged into the kiln coal storage bin.According to the need of coal warehouse, into the kiln front burner with a Roots blower, through the burner combustion air blower air supply for combustion, used for calcining limestone.

4.Finished product conveying system
Finished lime is conveyed to bucket elevator through chain bucket machine by cooler,then into top sieving grain silo by elevator, qualified part ≧5mm conveying to finished product bin by belt conveyer, powder≦5mm conveying to powder bin.Electric discharge valve is provided in finished product warehouse and powder bin. The main function of the finished product warehouse is for buffering measurement,the finished products should be promptly sent to the Steel Carbide factory to use reducing powdering.

5.Flue gas treatment system
High temperature flue gas from rotary kiln combustion, after the heat exchange with the limestone in preheater, the temperature dropped to 260 ℃ below,cooling through multi tube cooler and then into the high-temperature bag type dust collector.After dust collector,high temperature fan into the atmosphere through the chimney,the dust concentration is less than 30mg/Nm 3.
To meet requirements for the modernization process of active lime pre decomposition kiln production line, ensure the reliable operation of process equipment, stable process parameters, to ensure product quality, save energy, improve the production line running rate.The whole process adopt advanced technology controling, increase the DCS control on the basis of PLC control, centralized monitoring, operation and decentralized control of the main production line, control rotary kiln operating system to improve product quality and reduce consumption. To improve the reliability of electric control equipment and maintenance, to realize modernizatio of control, monitoring, operation.

6.Product quality
CaO ≥ 93, MgO ≤ 4.5, SiO2 ≤ 1, P ≤ 0.01, S ≤ 0.025 ignition loss ≤ 3, active degree ≥ 350ml ~ 380ml ≤ 1.5%, burning, burning ≤ 1.5%.
Process:
Qualified limestone deposited in the hopper, through hoist and transport into the top of silo.Preheater top bin, is made up of 2 level control the feeding amount, and then through the discharging tube of the limestone and uniformly distributed in the preheater each room.Limestone is heated from 1150°C to 900 ° C by kiln flue gas in preheater, about 30% decomposition, then into the rotary kiln by the hydraulic push rod,the limestone in the rotary kiln sintering is decomposed into CaO and CO2.After decomposition,limestone into cooler, the cold air is blown into the cooler cooling to 100 DEG C discharge. By 600 ° C hot air heat exchange into the kiln and gas mixing combustion.Gas mixed with cold air enter into dust collector by the fan,and through the exhaust fan into the chimney. Lime out of the cooler conveying into lime product warehouse by vibration feeding machine, chain bucket conveyor, bucket elevator, belt conveyor . According to the customer request whether screening processes...
Matching:
Vertical preheater
Vertical preheater is one of the main active lime equipment, the main effect of vertical preheater is the limestone material sent to the preheater, and use high temperature exhaust gas from the kiln calcining out emissions(1150 degrees Celsius), the material in the preheater evenly heated to about 900 degrees Celsius.In the preheating process of 30%CaCO3 is under preheater decomposition, and then by the hydraulic push rod into the rotary kiln calcination, calcination process that not only makes the limestone calcination time in the kiln is greatly shortened, obtain higher activities of lime.
Vertical preheater system mainly consists of six parts
1.Feeding system: mainly including the upper house, the discharge pipe, the materials and structure that can guarantee the body feeding safety sealed in preheater, so that the outside of cold air cannot enter into preheater inside, and material feeding can use stick valve to achieve continuous or intermittent feeding.
2.Preheater: it is the most important part of ensuring the material preheated to 900 degrees Celsius, which is composed of a preheating chamber, a suspension device and a refractory lining (this does not belong to the scope of equipment design and manufacturing) and other parts. This part of the structure is mostly metal component material selection, part of the heat-resistant steel according to the needs, working at 1000~1100 degrees Celsius high temperature heat-resistant steel. In addition, the refractory lining structure has the advantages of novel design, good sealing performance, can ensure material in preheater evenly preheated and achieve preheating temperature.
3.The pushing device: mainly including pusher, frame and the connecting rod part, pusher heat-resistant steel casting or welding to become, can withstand high temperatures, with the help of electric and hydraulic system, the hydraulic push rod can be automatic control procedures followed by pushing.
4.Hydraulic system: mainly comprises an oil tank, pump, motor, electromagnetic valve, hydraulic tubing, his main role is to control the pushing device, complete the pushing action.
5.Charging room: mainly including the chute feeding chamber, charging spout, body, its main function is to the material into the rotary kiln preheated calcined within.
6.Framework: It includes columns, ring beams , the main role is to carry the upper structure of the preheater
,
Technical
host performance 300t/d 600t/d 800t/d 1000t/d 1200t/d 1500t/d
preheater Type Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment Low wear vertical warehouse compartment
Shape Type 6 edges Type 12 edges Type 12 edges Type 18 edges Type 20 edges Type 22 edges
Preheating warehouse number 6 12 12 18 20 22
hydraulic push rod number 6 12 12 18 20 22
preheating amount(t) 1200 1200 1600 2000 2400 3000
Rotary kiln Specification Φ3.2×50m Φ4×60m Φ4.5×60m Φ5.0×58m Φ5.2×64m Φ5.6×76m
Slope 3.5% 3.5% 3.5% 3.5% 3.5% 3.5%
Rotary speed(r/min) 0.3-1.8 0.3-1.8 0.3-1.8 0.3-1.8 0.3-1.8 0.3-1.8
Burning temperature(℃) 1350 1350 1350 1350 1350 1350
cooler Type Partition upright Partition upright Partition upright Partition upright Partition upright Partition upright
Temperature controlling zone number 3 3 4 4 4 4
Air tower number 2+1 4+1 4+1 4+1 4+1 4+1
Specification(m) 3.6×3.6 4.1×4.1 4.7×4.7 5.2×5.2 5.4×5.4 5.8×5.8
Discharging temperature(℃) ≤80 ≤80 ≤80 ≤80 ≤80 ≤80
Product heat consumption(KJ/kg) 5400 5400 5000 4750 4600 4500
Adaptable fuel coke oven gas, mixed gas, natural gas, pulverized coal, low-heat value gas

Ohter Products
active lime production line equipment
600 tons of active lime production line equipment
1000 tons of active lime production line equipment
 Print [ close ] Top
Copyright © Jiangsu Pengfei Group Co.,Ltd. All Rights Reserved.
亚洲91久久_国产日韩亚洲欧美_日韩av在线一区_91精品中文在线
亚洲婷婷国产精品电影人久久| 在线观看欧美日韩国产| 国产精品白丝jk黑袜喷水| 亚洲国产综合91精品麻豆| 久久在线91| 亚洲电影免费观看高清完整版在线观看 | 亚洲区免费影片| 欧美成人自拍视频| 亚洲日本成人| 欧美性一区二区| 欧美在线看片| 精品盗摄一区二区三区| 欧美黄色小视频| 亚洲影院色无极综合| 国产欧美日韩麻豆91| 久久精品夜夜夜夜久久| 亚洲国产精品久久91精品| 欧美激情亚洲激情| 亚洲在线黄色| 尤物在线观看一区| 欧美三级特黄| 久久久久久夜精品精品免费| 亚洲日本视频| 国产精品一区免费视频| 久久亚洲精品中文字幕冲田杏梨 | 亚洲成色777777在线观看影院| 欧美高清免费| 午夜国产一区| 99精品久久久| 在线观看福利一区| 国产精品网站在线| 欧美福利一区| 久久国产福利| 亚洲新中文字幕| …久久精品99久久香蕉国产| 欧美日韩亚洲一区| 麻豆乱码国产一区二区三区| 亚洲欧美日韩在线播放| 亚洲理论在线观看| 尤物网精品视频| 国产人久久人人人人爽| 欧美日韩免费观看中文| 久久久久在线| 欧美伊人久久久久久久久影院| 亚洲美女在线国产| 亚洲国产精品精华液2区45| 国产一区二区三区黄视频| 国产精品大片wwwwww| 欧美黑人在线观看| 欧美成人一区二区三区在线观看| 久久黄金**| 性色av一区二区三区红粉影视| 亚洲午夜在线| 亚洲一区高清| 亚洲性感激情| 亚洲综合色丁香婷婷六月图片| 亚洲美女毛片| 99视频一区二区三区| 99riav久久精品riav| 亚洲日本成人网| 亚洲精品国产精品国产自| 今天的高清视频免费播放成人| 国产欧美一区二区精品仙草咪| 国产精品爱啪在线线免费观看| 欧美三日本三级少妇三2023| 欧美日韩日本视频| 欧美视频二区| 国产精品捆绑调教| 国产乱肥老妇国产一区二| 国产精品亚洲一区| 国产精品中文在线| 国产亚洲一区二区三区在线观看| 国产精品一区二区在线观看| 国产精品视频免费| 国产日韩精品在线| 国产亚洲精品成人av久久ww| 国产在线观看精品一区二区三区 | 亚洲欧美日本视频在线观看| 亚洲在线观看视频网站| 亚洲欧美999| 久久国产综合精品| 欧美阿v一级看视频| 欧美日韩成人免费| 国产精品人人爽人人做我的可爱| 国产精品天天看| 激情av一区二区| 亚洲美女尤物影院| 亚洲免费婷婷| 久久三级视频| 欧美日韩在线播| 国产日韩一级二级三级| 在线不卡中文字幕| 一本久道久久综合婷婷鲸鱼| 亚洲欧美日韩国产一区| 久久亚洲不卡| 国产精品av免费在线观看| 国产一在线精品一区在线观看| 亚洲国产精品电影| 亚洲夜间福利| 欧美jizzhd精品欧美巨大免费| 欧美日韩一区二区三区在线视频| 国产欧美日韩一级| 亚洲人成在线播放网站岛国| 亚洲综合色婷婷| 牛人盗摄一区二区三区视频| 国产精品久久久久天堂| 亚洲黄色成人| 久久久久九九九| 国产精品扒开腿爽爽爽视频| 这里只有精品视频在线| 性做久久久久久| 欧美国产精品中文字幕| 国产欧美日韩一区二区三区| 亚洲免费av网站| 久久久精彩视频| 国产精品网站一区| 亚洲精品久久久久| 久久九九精品99国产精品| 欧美色播在线播放| 91久久久久| 久久精品视频在线| 国产精品久久久久久亚洲毛片| 亚洲国产另类精品专区 | 噜噜爱69成人精品| 国产亚洲精品自拍| 亚洲字幕一区二区| 欧美日韩大片| 91久久极品少妇xxxxⅹ软件| 欧美伊人精品成人久久综合97| 欧美日韩一卡二卡| 亚洲精品社区| 欧美大片91| 伊人伊人伊人久久| 久久久久se| 国内精品伊人久久久久av一坑| 亚洲免费在线| 国产精品色一区二区三区| 亚洲午夜一区| 国产精品日本欧美一区二区三区| 一区二区三区日韩精品| 欧美午夜视频网站| 亚洲综合日韩中文字幕v在线| 欧美色播在线播放| 亚洲愉拍自拍另类高清精品| 欧美日韩一区国产| 亚洲曰本av电影| 国产精品视频免费| 欧美日本在线视频| 99国产精品视频免费观看一公开 | 欧美精品v日韩精品v韩国精品v| 在线观看视频亚洲| 牛牛影视久久网| 亚洲精品网站在线播放gif| 欧美激情精品久久久久久免费印度 | 一本色道精品久久一区二区三区| 欧美好吊妞视频| 一区二区三区免费网站| 欧美性猛交视频| 欧美一区二区精品在线| 激情懂色av一区av二区av| 麻豆精品精华液| 夜夜嗨av一区二区三区网页| 国产精品av久久久久久麻豆网| 亚洲欧美成人精品| 国产亚洲精品一区二555| 久久亚洲欧美| 日韩一级黄色av| 国产视频久久久久久久| 免费成人av| 一区二区三区**美女毛片| 国产精品久久久久77777| 午夜精品福利一区二区蜜股av| 国产一区二区无遮挡| 欧美精品一区二区三区视频| 亚洲欧美久久| 亚洲第一页自拍| 国产精品激情偷乱一区二区∴| 欧美一区二区视频在线| 亚洲国产视频直播| 99re6这里只有精品| 国产欧美日韩视频| 欧美风情在线| 亚洲一区二区三区在线播放| 国产亚洲福利| 欧美日韩一区在线播放| 久久亚洲精品中文字幕冲田杏梨| 国产精品99久久久久久有的能看 | 国产亚洲精品美女| 欧美全黄视频| 久久国产精品毛片| 夜夜爽www精品| 国外视频精品毛片| 欧美系列电影免费观看| 免费一级欧美在线大片| 久久成人精品电影| 亚洲午夜性刺激影院| 亚洲精品免费网站| 国产综合视频在线观看| 国产精品久久久久久久久久免费| 老牛嫩草一区二区三区日本|